The current subflooring is 3/4" plywood under an attractive parquet. In order for it to be flush with the dining room floor we need to replace the subflooring with 1/2" plywood. We just cut through both layers and popped them out with a crow bar.
We removed soffits on one side only. One the other wall the soffits cover plumbing for the upstairs baths.

0 comments:
Post a Comment